Updated 6:50am 29 August 2012

PICTURE - Milnsbridge section of Huddersfield Narrow Canal left drained by boater's lock mistake

AN ERROR by a boater left Huddersfield Narrow Canal drained today.

The boater failed to properly close a lock on the canal through Milnsbridge and it drained water out of a section.

Huddersfield Narrow Canal at Milnsbridge

That meant the Canals and Rivers Trust had to stop boaters using the waterway.

Engineers are on site to pump water from the River Colne into the canal but it is expected to take several hours.

Full story in tomorrow's Examiner.

Share